Hilton Hotel-top-down demolition by Cherry-Pickers

Date picture taken
unknown

Comments

The machine could be broken down into three major components i.e. engine & cab, operating boom and jack-hammer and then raised by cranes for reassembly on the work area.

Amongst many similar interesting videos is https://www.youtube.com/shorts/oBDEqAHXm3A

The operators must have had no nerves at all ot a very high rete of pay!

When the New World Centre at TST was being demolished top-down one these machines fell through the floors. Not for the first time in Hong Kong.